What is a percolation test? When is one needed? Why is it so important?
If a property is not connected to a main sewer, it will be connected to an off mains drainage system such as a septic tank, sewage treatment plant or cesspit.
If the property has a septic tank or a sewage treatment plant, the waste water from the tank will discharge either to a soakaway system such as a drainage field or to a watercourse. It’s good to be aware of the General Binding Rules here, which determine whether you are legally allowed to discharge to a watercourse - you can read our Guide to Septic Tank Regulations here.
If a septic tank or treatment plant is to discharge to a drainage field, a percolation test will be required.
This guide explains what a percolation test is, when it’s needed and why it’s important. It also outlines the basics of what’s involved in a percolation test, and how the results can be interpreted.
The purpose of a drainage field is to allow the wastewater leaving the septic tank or treatment plant to safely percolate into the ground. It is the percolation of the waste water through the subsoils which provides a form of treatment of the water, and allows it to pass into the local environment without causing pollution. A drainage field is typically comprised of a network of perforated or slotted pipes, which allow the waste water to pass into the surrounding sub soils.
The suitability of the ground conditions at a property are crucial to whether a drainage field will function properly, because the ground must be sufficiently porous to allow the wastewater to pass into it. If the ground is too wet or too impermeable, the wastewater will not be able to pass into it, and it will return to the septic tank or treatment plant, causing the system to surcharge. A percolation test measures the rate at which the waste water passes into the ground - if this happens too quickly or too slowly, the ground would be considered unsuitable.
If a percolation test demonstrates that the ground conditions are suitable for a drainage field, it will also determine what the dimensions of the drainage field should be. If you are installing a drainage field, or determining what type of off mains drainage system is required at a property, a percolation test is essential.
A percolation test typically involves a minimum of two test pits being dug in the area of a proposed drainage field. The weather on the day of the test can be important, as the tests shouldn’t be carried out during periods of heavy rainfall - this is because it can affect the results by making the ground more saturated than usual, and can also provide false results by filling up the test pits.
The British Standard Code of Practice for the Design and Installation of Drainage Fields for Use in Wastewater Treatment sets out in detail how a percolation test should be carried out. It states that a minimum of two test pits are required. In our experience, three test pits gives a more reliable result, and this is what we would recommend.
The test pits should be dug to the depth that any proposed drainage field would be installed. The British Standard document states that the pits should be excavated to a depth at least 300 mm below the proposed invert level (measured from the bottom of the pipe) of the drainage field. Once the test pits have been dug, they should be flooded first, and the water should be left to drain away completely. If the water drains away too quickly or too slowly, as per the guidelines set down by the British Standard document, the ground would be considered unsuitable.
If the water has drained away within an acceptable timeframe as above, the percolation test can be continued. This involves measuring the rate at which water seeps away from the pits, once they are refilled with water, and using this to calculate a percolation value (Vp). The results from the test are then used to calculate the size and layout of the drainage field required.
The General Binding Rules for Small Sewage Discharges set down what type of drainage systems are allowed.
A septic tank is not allowed to discharge straight to a watercourse or ditch, it must discharge to a drainage field. A treatment plant provides a level of treatment of the wastewater before it exits the tank, and is therefore generally allowed to discharge to a watercourse or ditch. If one is not within close proximity, it can also discharge to a drainage field.
If a percolation test fails, meaning that a drainage field is not appropriate for the property, a septic tank would not be suitable for the property.
The options then available are:
Percolation tests are essential to ensuring that the correct drainage system is installed at the property. They can be complex and involved, particularly around interpretation of the results.